Providence, RI

Solar installation in Providence, RI.

100+ projects installed in Providence, from the same company that surveys, permits, installs and services them.

100+installed in Providence
7.196 kWaverage system here
Rhode Island Energymost common utility
10 yearsworkmanship warranty

From our records as of October 2026. Records start in 2016.

What going solar in Providence involves

  1. A free quote based on your home and your electric use.
  2. A site survey at your home, about 90 minutes, covering the roof, attic, shade and electrical panel.
  3. Design and engineering, then the permit with Providence's building department and the interconnection application with Rhode Island Energy.
  4. Installation by our crews, followed by the town inspection.
  5. Permission to operate from Rhode Island Energy, and your system turns on.

See our full process · Rhode Island programs

Your local location

New England Warehouse

95 Ryan Dr, Suite 3, Raynham, MA 02767

Already have solar in Providence? Request service.

Questions from Providence homeowners

Does Skyline Solar install in Providence?

Yes. We have completed 100+ solar projects in Providence in the records we keep, which start in 2016. Our crews work out of Raynham, MA 02767.

What size are solar systems in Providence?

The Providence systems we've installed average 7.196 kW, compared with 7.914 kW across Rhode Island. Yours depends on your roof, your shade and your electric use, and the survey settles it.

Which utility handles solar in Providence?

Our Providence projects are mostly on Rhode Island Energy. Check your electric bill to confirm yours. We file the interconnection application either way.

Who do I call for solar service in Providence?

Use Request Service or call 732-354-3111. We also service systems other companies installed; those visits carry a trip fee, and we tell you the cost before we schedule.

More in Rhode Island: Warwick · All of Rhode Island

See what solar looks like on your Providence home.

The quote is free, and a Skyline surveyor sees the roof in person before anything is final.